(For USM Staff/Student Only)

EngLib USM > Ω School of Civil Engineering >

Estimating renovation waste and its management in Seberang Perai Selatan a case study in Nibong Tebal

Estimating renovation waste and its management in Seberang Perai Selatan a case study in Nibong Tebal / Muhamad Faizal Zainul
Sisa pembinaan dan perobohan adalah hasil daripada aktiviti pembinaan, pengubahsuaian dan perobohan struktur bangunan. Pertambahan sisa pembinaan dan perobohan akan bertambah dengan pertambahan pembangunan. Secara spesifiknya, kajian ini menumpukan kepada kegiatan pengubahsuaian rumah untuk skim perumahan di daerah Nibong Tebal. Sebanyak 7 buah perumahan telah dipantau semasa kajian dijalankan iaitu di antara Oktober 2005 hingga Januari 2006. Tambahan itu, maklumat yang berkaitan juga diperolehi daripada Pulau Burung Sanitary Landfill dan Majlis Perbandaran Seberang Perai (MPSP).Jumlah sisa yang dijanakan daripada aktiviti pengubahsuaian adalah sebanyak 49.64m3.Jumlah sisa tersebut memerlukan sebanyak 6 buah lori 10 tan untuk dipindahkan atau dibuang yang terdiri daripada 66 peratus konkrit dan bata, 15 peratus lain – lain sisa pembinaan, 14 peratus kayu dan 5 peratus untuk sisa besi dan aluminum. Dengan itu, pengurusan dan penyelesaian kepada sisa – sisa tersebut mestilah jelas dan boleh diharapkan agar ianya dapat diuruskan dengan betul. _______________________________________________________________________________________________________ Construction and demolition (C&D) waste is resulting from the construction, renovation or demolition of building structures. C&D waste will increase from time to time in proportion to the development of a town or country. Specifically, this study would be more on renovation activities around the area of Nibong Tebal housing schemes. A survey of 7 housing schemes throughout the area of Nibong Tebal was made from October 2005 until January 2006. In addition, in order to get the representative informations of waste handling and disposal, related information from Majlis Perbandaran Seberang Perai (MPSP) and Pulau Burung Sanitary Landfill were also considered. The total amount of waste generated regarding to renovation activity for all the housing schemes is about 49.64m3. These amount of waste required 6 number of lorries (10 tonnes) to evacuate the waste which composed of 66 percent concrete and bricks, 15 percent of other wastes, 14 percent of woods and the other 5 percent is for steel and aluminum waste. Thus, the necessity of finding appropriate management and solution to C&D waste destination must be reliable and clear so that the waste is well managed.
Contributor(s):
Muhamad Faizal Zainul - Author
Primary Item Type:
Final Year Project
Identifiers:
Accession Number : 875000206
Language:
English
Subject Keywords:
(C&D); waste; Landfill
First presented to the public:
5/1/2006
Original Publication Date:
9/8/2020
Previously Published By:
Universiti Sains Malaysia
Place Of Publication:
School of Civil Engineering
Citation:
Extents:
Number of Pages - 49
License Grantor / Date Granted:
  / ( View License )
Date Deposited
2020-09-08 17:05:08.914
Submitter:
Mohd Jasnizam Mohd Salleh

All Versions

Thumbnail Name Version Created Date
Estimating renovation waste and its management in Seberang Perai Selatan a case study in Nibong Tebal1 2020-09-08 17:05:08.914