The effect of redosage of the water to cement ratio on roperties of concrete subjected to time lag in concreting_Bong Yack Huang

The effect of redosage of the water to cement ratio on roperties of concrete subjected to time lag in concreting / Bong Yack Huang
Projek ini dijalankan untuk menentukan jumlah optimum air redos kepada konkrit segar untuk mengekalkan kebolehkerjaan konkrit tersebut dalam julat yang boleh diterima selama 105 minit. Projek ini juga bertujuan untuk mengkaji kesan menambah air kepada konkrit segar terhadap kekuatan mampatannya. Keputusan projek ini diperoleh melalui kerja-kerja eksperimen. Tiga set eksperimen yang sama dijalankan untuk mendapatkan hasil purata bagi mendapatkan hasil yang lebih tepat. Bagi setiap set eksperimen, dua ujian dijalankan, iaitu ujian kericihan konkrit dan ujian kuib konkrit. Ujian kericihan dijalankan pada T1 (0-45minit), T2 (45-90minit), T3 (90-105minit) dan T4 (105minit). Sementara itu, kiub konkrit disediakan pada T1 (0-45minit), T2 (45- 90minit) dan T4 (105minit). Ujian kiub konkrit dijalankan pada hari ketiga dan hari ke 28. Penambahan air dijalankan pada 45 minit selepas 45 minit (T2). 0.3% superplasticizer ditambah semasa pembancuhan konkrit untuk mendapatkan keruntuhan sebanyak 80mm yang diperlukan. Dari hasil eksperimen, jumlah pengurangan air yang meningkatkan nisbah w/c konkrit dari 0.45 hingga 0.50 dan 0.55 tidak mencukupi untuk memulihkan dan mengekalkan kebolehkerjaan konkrit dalam lingkungan 75-100mm dalam masa 105 minit. Kekuatan mampatan konkrit menurun selepas penambahan air, tetapi jumlah kemerosotannya adalah kecil. Semua kiub konkrit mencapai kekuatan mampatan melebihi keperluan minimum, iaitu 25MPa, tanpa mengira jumlah penambahan air. Dari projek ini, jumlah air redos yang optimum tidak dapat ditentukan kerana kebolehkerjaan konkrit yang mengalami kelewatan 105 minit tidak dapat dipulihkan dan dikekalkan dalam lingkungan 75-100mm yang detetapkan. _______________________________________________________________________________________________________ This project is carried out to determine the optimum amount of water redosage to fresh concrete in order to maintain the workability of concrete within the acceptable range for 105 minutes. This project is also aimed to study the effect of adding water to the fresh concrete on its compressive strength. Results of this project are obtained via experimental works. Three sets of the same experiments are carried out to obtain the average result for a more accurate outcome. For each set of experiment, two tests are conducted, namely slump test and concrete cube compression strength test. The slump test was carried out at T1 (0-45mins), T2 (45-90mins), T3 (90-105mins) and T4 (105mins). Meanwhile, concrete cubes were prepared at T1 (0-45mins), T2 (45-90mins) and T4 (105mins). Concrete cube compressive strength test was conducted at days 3 and days 28. Water redosage was carried out at 45 minutes after batching (T2). 0.3% of superplasticizer was added during the mixing of concrete in order to obtain a required slump of 80mm. From the results of experiments, the amount of water redosage that increased the w/c ratio of concrete from 0.45 to 0.50 and 0.55 is not sufficient to restore and maintain the concrete workability within the range of 75-100mm over 105 minutes. The compressive strength of the concrete decreased after water redosage, but the amount of strength deteriorated are small. All of the concrete cubes achieved compressive strength above the minimal requirement of 25MPa, regardless of the amount of water redosage. From this project, the optimum amount of water redosage is unable to be determined since the workability of concrete subjected to a delay of 105 minutes is unable to be restored and maintained within the acceptable range of 75-100mm.
Contributor(s):
Bong Yack Huang - Author
Primary Item Type:
Final Year Project
Identifiers:
Accession Number : 875008289
Language:
English
Subject Keywords:
water; redosage; concrete
First presented to the public:
5/1/2019
Original Publication Date:
9/24/2019
Previously Published By:
Standard Malaysia
Place Of Publication:
School of Civil Engineering
Citation:
Extents:
Number of Pages - 89
License Grantor / Date Granted:
  / ( View License )
Date Deposited
2019-09-24 14:37:50.282
Submitter:
Mohd Jasnizam Mohd Salleh

All Versions

Thumbnail Name Version Created Date
The effect of redosage of the water to cement ratio on roperties of concrete subjected to time lag in concreting_Bong Yack Huang1 2019-09-24 14:37:50.282