Objektif projek ini iaiah menilai keberkesanan sistem rawatan RBC di Pekan Lama Ipoh dan kajian makmal tentang corak perlumbuhan bakteria sistem RBC dan faktor-faktor utama yang mempengaruhinya (beban hidraulik & baban organik). Penyiasatan dibuat dengan mengkaji kecekapan pcnyingkiran BOD pada unit RBC. Setelah kajian teiiti terhadap sistem rawatan RBC di Ipoh didapati elluennya tidak dapat memenuhi Standard B Akta Kualiti Alam Sckitar 1974. Ini disebabkan oleh rekabentuk dan penyelenggaraaan yang kurang memuaskan. Masalah rekabentuk seperti tiada tangki ^ penstabilan yang menyebabkan kadar alir dan kepekatan influen yang tidak sekata, tidak ada tangki pengenapan primer dan pemeringkatan dalam sistem RBC. Di samping itu, kajian juga dibuat tentang kedudukan yang paling sesuai untuk meletakkan unit RBC di KCP, USM. Untuk kajian tentang kedudukan unit RBC, didapati kedudukan yang paling sesuai ialah selepas kolam pengoksidaan. Keputusan ini dicapai berdasarkan rekabentuk asas RBC yang menolong dalam menjangka kos pembinaan, kos operasi dan selenggaraan. Dengan kedudukan ini, struktur baru seperti penyaring halus, tangki pengenapan, tangki penstabilan boleh diketepikan kerana fiingsi ini dapat dilakukan oleh kolam pengoksidaan yang sedia ada. Unit RBC hanya berflingsi sebagai rawatan tertier untuk memperbaiki kualiti efluen. Kajian makmal RBC tentang corak pertumbuhan biojisim dibuat berdasarkan kpcekapan pcnyingkiran BOD. Anggapan ialah kecekapan pcnyingkiran bergantung kepada biojisim yang ada.. Dari hasil kajian ini, didapati l^ecekapan pcnyingkiran BOD berhubung secara linear kepada beban hidraulik dan beban organik. Didapati juga kadar pertumbuhan biojisim adalah lambat pada peringkat awal dan kadar pertumbuhan biojisim mula bertarnbah banyak selepas 15 hari. Selain daripada itu adalah dijangkakan masa pengaktilan untuk RBC bergantung kepada kadar alir dan kepekatan influen (beban hidraulik dan beban organik). ______________________________________________________________________________ The objective of this project is to evaluate the efiiciency of RBC treatment plant at Ipoh Old Town dan laboratory study on biomass development in new RBC system and factor effecting its efficiency. To carry out this study, the eOlciency removal rate of RBC is monitored. After some laboratory testing, the RBC at Ipoh Old fown is found to be ineftecient. The effluent did not meet the Standard B of Quality Environment Act 1974, The main cause is due to inadequate design and maintenance. The main design problems are, there is no equalization tank and primary sedimentation tank and no stages in the ^ current RBC unit. These will caused the flactuation in di.scharge and concentration. In order to overcome this problem, an equalization tank, primary sendimentation tank and stanging in RBC is proposed. Beside that a desk study was carried out to propose a '* f suitable location for RBC treatment plant in USM, KCP and it is found that the most suitable location for RBC in KCP is after the oxidation pond. The conclusion was made base on the basis design of the RBC which determine the cost of construction, maintenance and operation. New structure such as fine screening, equalization tank and ''' primary sendimentation tank can be ommited because the existing oxidation pond will take over their function. The RBC will function as tertiary treatment to improve the effluent quality. Study on biomass development was base on the BOD removal efficiency. This is because the efficiency of BOD removal depend upon the population of ^ biomass. From the results of the study, it is observed that the efficiency of BOD removal was linearly related to organic and hydraulic loading. The biomass development was very slow at initial stage but after 15 days of operation the rate of development was faster. The time used to develop the biomass in RBC media is expected to be dependent on the hydraulic and organic loading.
Contributor(s):
Ng, Ban Soon - Author
Primary Item Type:
Final Year Project
Language:
Bahasa Melayu
Subject Keywords:
treatment plant ; equalization tank ; primary sedimentation
First presented to the public:
4/1/1995
Original Publication Date:
5/15/2018
Previously Published By:
Universiti Sains Malaysia
Place Of Publication:
School of Civil Engineering
Citation:
Extents:
Number of Pages - 159
License Grantor / Date Granted:
  / ( View License )
Date Deposited
2018-05-15 15:58:55.131
Date Last Updated
2020-05-28 09:28:48.384
Submitter:
Nor Hayati Ismail

All Versions

Thumbnail Name Version Created Date
Kajian sistem rawatan penyentuh biologi berputar / Ng Ban Soon1 2018-05-15 15:58:55.131