(For USM Staff/Student Only)

EngLib USM > Ω School of Civil Engineering >

Determination of flood inundation for sungai bertam by hydraulic physical model

Determination of flood inundation for sungai bertam by hydraulic physical model / Nurfatihah Idayu Rohalim
Empangan dibina sebagai tempat simpanan air untuk mengimbangi kenaikan dan penurunan aliran di kawasan tadahan dan untuk menjana elektrik. Walau bagaimanapun, jumlah pelepasan yang tidak terkawal dikeluarkan dari pintu alur limpah empangan akan memberi kesan kepada kawasan hilir. Pada 23 Oktober 2013, banjir yang berlaku di hilir Sungai Bertam mungkin disebabkan oleh jumlah pelepasan yang tinggi yang dikeluarkan dari empangan Sultan Abu Bakar (SAB). Kesan daripada banjir itu, tiga orang telah disahkan maut dan hampir 100 rumah dimusnahkan atau tenggelam manakala lebih daripada 100 kenderaan rosak teruk. Oleh itu, kajian mengenai pelbagai pelepasan yang dikeluarkan di sepanjang sungai telah dijalankan. Objektif utama kajian ini adalah untuk menentukan pelepasan maksimum tanpa sebarang banjir di Kampung Baru Lembah Bertam untuk 175 m3/s untuk 100 tahun ARI. Tahap air banjir dapat membantu menilai kesan di kawasan itu akibat pelepasan empangan SAB. Ujian model fizikal dilakukan untuk menganalisis pelbagai pelepasan yang dikeluarkan. Selepas ujian model fizikal, perisian Surfer digunakan untuk menggambarkan keadaan dan kawasan risiko banjir. Jumlah pelepasan pelepasan yang digunakan dalam eksperimen adalah 8, 16, 24, 32, 40, 48 dan 56 l/s. Pelepasan air adalah berdasarkan cadangan pembebasan empangan oleh Tenaga Nasional Berhad (TNB). Akibatnya, kedalaman maksimum, halaju maksimum, dan ilustrasi dihasilkan. Temuan ini dapat meramalkan kawasan bahaya banjir. Kajian ini juga akan membantu pihak berkuasa mengendalikan jumlah tahap pelepasan maksimum yang dibenarkan dari empangan untuk mengelakkan banjir berlaku di kawasan hilir Sungai Bertam. _______________________________________________________________________________________________________ Dams are constructed as water storage to compensate for fluctuations in catchment area and to generate electricity. However, uncontrollable amount of discharges released from the gated spillways of the dam would impact the downstream area. On October 23 2013, floods occurred in downstream of Sungai Bertam probably due to a huge volume of discharges were released from Sultan Abu Bakar (SAB) dam. Impacts of that flood, three people were confirmed dead and nearly 100 houses destroyed or under water while over 100 vehicles badly damaged. Thus, study on various discharges released along the river was conducted. The main objective in this study is to determine the maximum discharge without any flood inundation at Kampung Baru Lembah Bertam for 175 m3/s for 100 year ARI. The flood water level can help evaluate effect of in that area due to SAB dam release. The physical model testing was done to analyse various discharges released. After the physical model testing, Surfer software was used to illustrate the condition and risk area of flooding. The amount of discharges release used in the experiment was 8, 16, 24, 32, 40, 48 and 56 l/s. The water discharges were based on recommendation dam release by Tenaga Nasional Berhad (TNB). As a result, maximum depth, maximum velocity, and inundation illustration were produced. This finding will be able to predict risk area of flooding. This study will also help authorities to control amount of maximum discharge level allowed from the dam as to prevent flood occur in downstream area of Sungai Bertam.
Contributor(s):
Nurfatihah Idayu Rohalim - Author
Primary Item Type:
Final Year Project
Identifiers:
Accession Number : 875007612
Language:
English
Subject Keywords:
Dams; water storage; generate electricity
First presented to the public:
6/1/2018
Original Publication Date:
8/3/2018
Previously Published By:
Universiti Sains Malaysia
Place Of Publication:
School of Civil Engineering
Citation:
Extents:
Number of Pages - 61
License Grantor / Date Granted:
  / ( View License )
Date Deposited
2018-08-03 15:59:35.445
Date Last Updated
2020-05-20 23:34:19.723
Submitter:
Mohd Jasnizam Mohd Salleh

All Versions

Thumbnail Name Version Created Date
Determination of flood inundation for sungai bertam by hydraulic physical model1 2018-08-03 15:59:35.445